1 / 25

2 / 25

3 / 25

4 / 25

5 / 25

6 / 25

7 / 25

8 / 25

9 / 25

10 / 25

11 / 25

12 / 25

13 / 25

14 / 25

15 / 25

16 / 25

17 / 25

18 / 25

19 / 25

20 / 25

21 / 25

22 / 25

23 / 25

24 / 25

25 / 25

Getting ready to hoist
Landing another load
Donnie Schwendeman waiting to unhook the load of lumber once it has been landed
Bringing in another load
Donnie climbing out of the hold for lunch
Looking over the machinery to be unloaded
Looking up at a container which was imporperly loaded with sheet metal coils
The bow of the Westwood Borg
Using the emergency gear to off load the damaged container
Lashing gang on the stern of the Westwood Cleo
Semi gang working the ship
Donnie on his way down into the hold to delash the machinery
Another view of the damaged container
Landing a container
Two gangs working the ship
Another view of the damaged container
Crane operator picking up a damaged coil off the deck which fell out of the container
Foreman talking to the crane operator as the coil is lifted
Removing the damaged coil
Landing the damaged coil on to a mafi board
Cedric Fields on the apron
Parked machinery after being unloaded.
Unhooking a landed piece of machinery
The Westwood Belinda, Fisher's flour mill and the West Seattle bridge
Container operations in progress